DCPR 2034: Mumbai’s Development Regulations, Calculated Instantly
The Development Control and Promotion Regulations for Greater Mumbai, 2034 (DCPR 2034) govern all building and redevelopment work under the Municipal Corporation of Greater Mumbai (MCGM/BMC). The State Government sanctioned them in May 2018 alongside the Development Plan 2034, and they came into force on 1 September 2018. They replaced DCR 1991 and have been amended many times since, through notifications, corrigenda and government clarifications.
Where DCPR 2034 Applies
DCPR 2034 covers the Island City, the Suburbs and the Extended Suburbs within MCGM limits. The Manori-Gorai-Uttan notified area is excluded. The rest of Maharashtra follows UDCPR.
Why It Matters for Feasibility
In Mumbai, the Table 12 FSI is only the starting point. Island City plots start at a zonal FSI of 1.33 and can reach 3.0 on 27m+ roads with premium FSI and TDR. Suburban plots start at 1.0. On top of that come 35% fungible FSI and the Section 33 schemes, which often decide whether a deal works:
- 33(7), 33(7A), 33(7B) for cessed, tenanted and society redevelopment
- 33(9) cluster redevelopment and 33(10) SRA
- 33(5) MHADA layouts and 33(20B) affordable housing
- 33(19) commercial, 33(13) IT and data centres
- Add-ons such as 33(12B), 33(18) and 33(23) TOD
Each scheme comes with its own conditions on plot size, road width, consent and premium. Picking the wrong one, or missing a valid combination, can leave a lot of value on the table.
How Archonet Helps
Archonet keeps up with the latest DCPR 2034 amendments. It finds the schemes that apply to your plot, generates FSI statements, works out premium and approval costs, and compares scheme combinations side by side in minutes. It’s built for Mumbai developers, society redevelopment advisors and feasibility consultants.
DCPR 2034, Session by Session
The Archonet DCPR Webinar Series, recorded in full, each with a written recap.