DCPR 33(11): Is Max FSI Calculated on Gross Plot or Net Plot?
On 21 November we hosted a live session on a question that keeps turning up in developers’ feasibility sheets: under DCPR 33(11), is the maximum FSI worked out on the gross plot or the net plot? More than 75 developers, architects and feasibility consultants joined us live, and the questions kept coming until the last minute. This was our second session on the scheme. If you missed the first, our DCPR 33(11) PTC scheme recap covers the FSI table, clubbing and why road setback skews area statements. You can also watch the full webinar here.
Table of Contents
DCPR 33(11) max FSI: gross plot, not net
For most plots, max FSI under DCPR 33(11) is still calculated on the gross plot. Only the zonal FSI loses the road setback. Take a 1,000 sq.m plot with a 100 sq.m setback at an FSI of 4.0:
- Zonal FSI: 1,000 − 100 = 900 sq.m
- Max FSI: 1,000 × 4 = 4,000 sq.m
- Balance area for sharing: 3,100 sq.m
The gross versus net debate really applies to one case: plots that fall in CRZ II.
How CRZ II changes the DCPR 33(11) calculation
Run the same plot through CRZ II and the sums change. Max FSI is calculated on the net plot (900 × 4 = 3,600 sq.m), and you get DR (development rights) against the setback. In the suburbs that is 100 × 2 = 200 sq.m. When an attendee asked how to find the setback area, the answer was that the system picks it up, or you can take it from the DP remark.
The regulatory trail runs through two documents. The 14 July 2022 circular (TPB-4321/73/CR-57/2021/UD-11) calculates FSI on the plot area after removing land handed over for reservations or existing amenities, but not land for proposed DP roads or the prescribed road line. For CRZ II, the CRZ Notification 2019 allows reconstruction of authorised buildings on the FSI norms prevailing when it was published.

What it does to your numbers
We compared a CRZ II plot with a non-CRZ plot, PTC built in-situ in both:
| CRZ II | Non-CRZ | |
|---|---|---|
| Max permissible BUA | 12.2K sq.m | 14.5K sq.m |
| RERA sale area | 50.4K sq.m | 63.4K sq.m |
| Revenue | ₹470 Cr | ₹573 Cr |
| Total cost | ₹216 Cr | ₹256 Cr |
| Net profit | ₹254 Cr | ₹317 Cr |
Margin as a percentage barely moves (54% against 55%). The absolute profit does. This is an illustrative model, so treat your own plot’s numbers as the ones that count.
BMC vs SRA: will DCPR 33(11) concessions continue?
The second half of the session covered the Municipal Commissioner’s letter of 22 July 2026. It asks two things: can SRA have jurisdiction over non-slum plots with no contiguous slum area, and will the 33(10) concessions on premium, LOS and open space that DCPR 33(11) schemes use today remain?
Those concessions carry real weight in feasibility: relaxed side setbacks, LOS at 8% of the balance plot, parking relaxed to 50%, and OSD and staircase premiums at 10%. Asked live whether SRA’s justification for non-slum plots had been resolved, we said it is still unclear. Our workings use the concessional rates applicable under 33(11) of DCPR.

What you asked us
Registration questions clustered around premiums and open space, the BMC–SRA dispute and CRZ II, with clubbing, PTC calculation and 33(11) of DCPR 2034 versus 33(20)(B) close behind. Some questions, such as whether approvals are currently on hold, need clarity from the authorities first. We will share updates in our DCPR Learning Circle WhatsApp community.
See it on your own plot
We modelled the CRZ II comparison live on the Archonet platform. To run your own plot, head to app.archonet.in. Dont miss any of your deals and evaluate opportunities within minutes.

FAQs
Is max FSI under 33(11) of DCPR 2034 calculated on gross or net plot?
Typically on the gross plot. For CRZ II plots it is calculated on the net plot, with DR against the road setback.
How is road setback treated in 33(11)?
It is deducted for zonal FSI. Max FSI stays on the gross plot, except in CRZ II.
What is DR in the CRZ II calculation?
DR means development rights. In the suburbs, the example gives 100 sq.m of setback × 2 = 200 sq.m.
Will 33(11) premium and open space concessions continue?
This is open. The Municipal Commissioner’s 22 July 2026 letter questions them, and the position was unclear at the time of the webinar.
Does CRZ II reduce profitability?
In our model, yes. Net profit for a sample project was ₹254 Cr against ₹317 Cr for a non-CRZ plot.
The recording of the webinar: