CDCPR 2023: MIDC Development Regulations, Calculated Instantly
The Comprehensive Development Control and Promotion Regulations (CDCPR) govern all building and development work on land notified for the Maharashtra Industrial Development Corporation (MIDC). The Urban Development Department sanctioned them by notification dated 5 July 2023, and they came into force when published in the Official Gazette that month. CDCPR replaced MIDC’s 2009 DCR and brought its rules in line with UDCPR, while keeping provisions specific to industrial areas.
Where CDCPR Applies
CDCPR applies across MIDC industrial areas where MIDC is the Special Planning Authority, from Thane-Belapur and Pune to Nagpur, Aurangabad and beyond. UDCPR does not apply in these areas, and neither does Mumbai’s DCPR 2034.
Why It Matters for Feasibility
Most MIDC plots start at a basic FSI of 1.00. Depending on the road width, premium FSI can take that up to 3.00 on 30m+ roads. Ancillary FSI of up to 80% for industrial and non-residential use, and 60% for residential, comes on top, subject to premium. The bigger opportunity is in the special schemes:
- IT/ITES, data centres and Smart FinTech centres
- Biotech parks and commercial buildings
- Redevelopment of old and dangerous buildings
- EWS/LIG housing and PMAY
- Integrated Industrial Areas, IT Townships and Logistic Parks
- TOD and green building incentives
Each scheme has its own conditions on road width, plot size and premium, all charged at MIDC land rates. Two plots in the same industrial area can end up with very different potential.
How Archonet Helps
Archonet keeps up with the latest CDCPR amendments. It finds the schemes that apply to your MIDC plot, generates FSI statements, works out premium and approval costs, and compares schemes side by side in minutes. It’s built for industrial developers, logistics and data-centre investors, and feasibility consultants.